So currently I just need to make a spot for the front tiebar because it was busted out, so it needs to be welded. Also need to weld spots so I can attach the sub-frame to the frame, but I have that all setup just need to put it on. The clutch im going to have the local harley shop to do it. The clutch was turned to hamburger when the primary cover busted in, so that needs to be completely replaced. So by next week she will be running.