So it took about 2 hours to do the whole pipe . i did not rotate the motor.
1>remove shock
2>remove fan
3>removeo2 sensor
4>remove flange nuts 1/4 drive will be needed for lower rear flange nut
5> rotate rear head pipe till pipe slides out
6> retrace process in reverse with micron