• You are currently viewing our boards as a guest which gives you limited access to view most discussions and access our other features. By joining our free community you will see less advertisements, have access to post topics, communicate privately with other members (PM), respond to polls, upload content and access many other special features. Registration is fast, simple and absolutely free so please, join our community today!

    If you have any problems with the registration process or your account login, please contact us.

The Jappa in my garage.....

Buellxb Forum

Help Support Buellxb Forum:

On this most unique and sacred of American holidays.....i say:

Being the son of a decorated WW2 US Army Air Corps pilot who was a real hero....and proud supporter of our incredible law enforcement who protect the homeland and keep us all safe....i say thank you for your service and sacrifices. God bless our Police and Military members.

Det. John R. Lutz, Retired
Pennsylvania State Police

At the 11th hour, on the 11th day, of the 11th month, the guns fell silent.

They grow not old as those who are left behind grow old, we WILL remember them. Lest We Forget.
 
Some progress on the trike, small steps. I made a stencil of the area on the bike that we're using to attach the rear sub-frame too. Transferred that shape to 3mm MSteel and cut out the LHS plate, some rough shaping and a 16mm hole. Fits ok, but still needs some more shaping and mounting holes drilled. The stencil transfers to the RHS with a little bit of allowance to be made for jiggly poke poke fitting.
From these two plates will be welded the connection points for the new swing arm pivot point.
RHS stencil on bike.jpg
LHS Stencil steel.jpg
LHS Mounting1.jpg
This is what I'm aiming to replicate:
LHS subframe.jpg
 
Stencil board......living up to its name! I was introduced to it 20 plus years ago and I still use it to make one off parts. Quicker then designing it on the PC and leaves plenty of room for fudging..LOL
 
So there has been some progress, spent they day doing some fab work.
20191215_202814[1].jpg
20191215_202952[1].jpg
20191215_214134[1].jpg

We splashed out and bought a new Pipe bender,
20191127_174607[1].jpg
and I had some bits floating around so I made a manual press brake to fold 3mm plate,
20191215_131656[1].jpg
 
Some more progress, and some backwards steps.
We purchased a new, smaller, diff to use but I soon realized my mistake in not thoroughly checking out the ratio's available for the crown wheel and pinion. Of course this was AFTER I had stripped, cut, shortened and re welded it. The diff currently has a 5.57:1 ratio gear set in it and I was of the understanding I could purchase aftermarket sets to change the ratio to around 2.6:1 as per the original bike rear end........but the housing is so small the gear set needed to get that ratio is too large to fit in the housing and therefore not manufactured in any way shape or form.....:sorrow: So I have gone back to my original diff housing with a gear set in it that is 2.9:1. The reason for purchasing the smaller housing was to reduce the weight and improve the handling, but they are now things that will be compromised to a degree by using the original housing I had.
I purchased a tube notching tool to speed up the process of fitting pipes together at differing angles as I was over spending 2 or 3 hours a weekend grinding and fitting pipe.(as were the neighbors) A tedious task that I wasn't happy about doing, made much faster and easier.
I had to modify one of the new tube bender former's as it was over sized and kinked the pipe during bending instead of 'forming' it neatly. The 20mm former was 2mm over sized which dosen't sound like much but allowed the pipe to expand sideways during bending and that caused the pipe to crush and kink. It needs to be held snugly by the former at all times through the whole process so I scrounged some 0.9mm metal sheet from the scrap bin at work and shimmed the former on both sides. Problem solved.:D
I have formed, fitted and fully welded both the LH and RH lower chassis mounts and got them bolting up nicely with the chassis and I have dug out the original diff housing that I had begun to narrow and got it set up for welding, so that will happen in the next few weeks.
Onwards!

I will post up some pictures of the finished Chassis mounts soon, I have to resize them (the pic's) and I can't be arsed at the moment. Too much to do and not enough Nade to go round.
Heres a BUELL to look at:up:
30063_0_1_4_xb12scg lightning_Image credits - Buell.jpg
 
Here is some pictures to show the mounts and the welding of the narrowed diff.

lower mounts.jpg

Diff Set Up.jpg

TIG Root Run.jpg

Flux Core diff.jpg

I have made some rear upper mounts for the rear tray/ suspension cross bar and dummy fitted it for the moment.
I have sourced some Drag Link Bar bushes that I want to use in the swing arm, just waiting on the finance department to get the barbed wire out of her pockets so she can open the wallet.
I will take some more photo's of the assembly as it is now, not much to look at but believe me there is many hours of thinking and tinkering to get things to work.....there is a pile of '1st attempts' and 'version 2' slowly accumulating.
 
So I thought it might be time to update this a little bit.

I've been banging my head against a brick wall for a while with re-guards to a Certifier. I'm so far away from the nearest one's that they have not been willing to engage in the process, and this pissed me off. I forged on ahead with the build, over thinking alot, re-doing parts over and over until I was satisfied with them.
so now I'm at the point of really needing a certifier to be onboard so I can finish the damn thing. Hopefully I have a guy who will do it but he asked me leave it till the new year.....its the 1st of Jan 2021.....is it too early to annoy him yet!?
I have some more photos of bits and pieces to share, so progress is being made......slowly slowly.
I also splashed out and bought a new Bench lathe and new TIG welder for home, so no more taking bits to work to finish them or having to wait until I am at work to do things.
20200408_201026.jpg rear subframe being bent and fitted ready for welding off.
 

Attachments

  • 20200415_145229.jpg
    20200415_145229.jpg
    190.2 KB
  • 20201026_171436.jpg
    20201026_171436.jpg
    88.2 KB
  • 20201026_172100.jpg
    20201026_172100.jpg
    87.3 KB
  • 20201031_205219.jpg
    20201031_205219.jpg
    112.6 KB
20200525_180233.jpgNew bench lathe
20200526_143949.jpgNew TIG welder
20200418_101943.jpgA view to a Buell....or 2...always a battle, to build or to go for a ride....:cool:
 
So....how many years now......so much messing around. BUT I have a guy coming next month, who is a trike certifier, so there will be flurry of action for the next few weeks.
Below is the method I am hoping to use to connect the swing arms to the diff tubes. There are gussets as well to joint the tube to the box.
20210209_184614[1].jpg
 
20210228_155111.jpg
LH swingarm fully longitudinally welded, ready to be welded to the diff mounting blocks
20210228_152307.jpg
LH and RH diff mounting blocks. These slide over the diff axle tube before I weld the bearing cups on, and the swing arms butt onto the flat faces.
20210228_195531.jpg
These are the wheels my GF has chosen, and a sneak peek of how things will look.
 
FB_IMG_1628841894583.jpg

progress. It is rideable, but the rear brake master cylinder needed to be changed to a larger one, and that meant i had to redesign and fabricate a new foot rest assembly, still in progress. steps forward.....sideways shift....
 
Interesting read and nice work on the trike. The regulations for customizing vehicles concerns me both for and against. The east coast of the. US mostly has annual safety inspections the west emissions tests. The middle mostly lax on either. But for suspension brakes and frame modifications it seems like you have a wonderful resource for engineering help and final safety inspection.
I wish we had a similar program here.
 
Yes, the system does work.....and I have learned ****loads along the way. Good things take time, and sadly I wayyyyyy underestimated how much time goes into building a trike.....the physical building part is really quite small compared to the time spent researching, planning, preplanning.....the forward thinking and the little details.
 
So this Trike has taken several years. Ain't life wonderful.

It is very near ready for its first official teat ride by the certifier. I have a minor issue where I used the wrong tube nuts on the brake likes and the threads bottomed out before sealing. I got brake fluid everywhere......and I have to redo all the hard lines again with new tube nuts as cutting the existing lines to fit new tube nuts makes the lines just a bit to short and messes with the aesthetics. pedantic, yes. time consuming, yes. I am putting together a file for the Certifier with all the materials and any conceivable photo of everything I've done, which he will submit to the powers that be, and then if he is comfortable with the way it rides etc I get to then pull it all apart again, and then paint it all up pretty and nice. The Blue guard I sprayed out shows the colour. Once I paint it all, put it back together and the certifier is happy I haven't changed anything and tried to hide it with bog (bondo) or paint......I can then let the good woman ride. And I get my Buell to myself.....:cool:
20210723_221627[1].jpg20210724_135211[1].jpg20220404_175002[1].jpg20220309_195544.jpg20210726_203032.jpg
I do have a short video somewhere which I will find and post eventually, of me test riding it a few months ago........
 
Back
Top